| no. |
JOB-SITE & STUDY AREA |
CUSTOMER |
JOB DESCRIPTION |
CONSTRUCTION PEROID |
| 85 |
26-Provinces, Central part of Thailand |
Royal Thai Department of Groundwater Resources. (DGR) |
Integrated Surface and Groundwater development for sustainable lift. |
2009-2011
Work In process |
| 84 |
Bangkok and metropolitan. |
Water Work Authority of Thailand (WWA) |
Water Supply Safeguarding Canal, This Project was supply water > 2.5 x 106 m3/day. 10x106 xpopulation. |
2000-2009
Work In process |
| 83 |
Saraburi,Asia Cement Factory |
Asia Cement Co.ltd. |
Waterwell drilling and Development 2xholes 8inchx150Cu.M/hr. |
Sep.2009 - Oct.2009 |
| 82 |
DGR. |
Upper Central Plan Region |
Investigation for risk assessment of contaminated groundwater resources by industry, agriculture and landfill. |
Jun.2009 - Jul.2009 |
| 8 |
Dusit, Bangkok. |
Samsen Brewery co.,Ltd. |
TV Borehole, wells rehabilitation and wells development, 4 wells |
Nov.2008- Mar.2009 |
| 80 |
Saraburi Province |
Asia Cement Co., Ltd. |
Feasibility study on groundwater resources in the area of Asia Cement and its vicinity, Phukrang plant. |
Oct.2008 – Dec.2008 |
| 79 |
Chiangmai Province |
Chiangmai Beverage Co., Ltd. |
TV Borehole, wells rehabilitation and wells development. |
Aug.2008 |
| 78 |
Ayutaya Province |
Canon Enginering (Thailand) |
Groundwater flow net, Observation wells drilling and groundwater contamination. |
Apr.2008 - Aug.2008 |
| 77 |
Ayutaya Province |
Canon Ayutaya (Thailand) |
Groundwater flow net, Observation wells drilling and groundwater contamination. |
Apr.2008 - Aug.2008 |
| 76 |
Ayutaya Province |
Canon Hitech (Thailand) |
Groundwater flow net, Observation wells drilling and groundwater contamination. |
Apr.2008 - Aug.2008 |
| 75 |
Chiangmai Province |
Chiangmai Beverage Co., Ltd. |
TV Borehole, wells rehabilitation and wells development. |
Oct.2007 |
| 74 |
Prachinburi |
Betago Group |
Groundwater Investigation. |
Jun.2007 |
| 73 |
Saraburi |
Asia Cemcnt Co., Ltd. |
Feasibility study on groundwater resources |
Nov.2006 – Dec.2008 |
| 72 |
Klong 13, Lam Lookkha
Pathum Thani Province |
Thai Pure –Drinks (CoCa-CoLa) |
Source Vulnerability Assessment, SVA |
Jun.2006 – Dec.2006 |
| 71 |
Petchaburi |
Jalaprathan Cement Public Co., Ltd. |
Resistivity survey and EM survey for possible water well drilling location |
Nov.2005 - Dec.2005 |
| 70 |
Central Plain Basin |
DGR. |
GIS and MIS Database for study of clay spreading and contaminated protection |
Jun.2005 - Feb.2006 |
| 69 |
Kanjanaburi |
Thai Kraft Paper Industry
Co., Ltd. |
Groundwater resource evaluation |
Oct.2005 |
| 68 |
East Region |
DGR. |
Resistivity survey for possible water well drilling location |
Sep.2005 |
| 67 |
Leam- Chabang Shipyard |
Unithai Shipyard Engineeringco., Ltd. |
Groundwater survey, drilling well
12" x 15m. |
Aug.2005 |
| 66 |
Ayutaya Province |
Wang Noi Brewer Rest
Co., Ltd |
Water well development
2 well |
Jun.2005 |
| 65 |
North-east Region
105 Area |
DGR. |
Resistivity survey for possible water well drilling location |
Apr.2005 - May.2005 |
| 64 |
Pathum Thani Province |
Top Feed Mills Co., Ltd. |
Well design and construction, pumping test and analysis. Well drilled at depth 320 m.,4", 15m.3/hr
Plugging for water well abandoned 6", 240m. |
May.2005 |
| 63 |
Upper Chao Phaya Basin |
Royal Irrigation Department |
Improvement of the Irrigation system in the Phitanulok ProjectSponsor by Spanish Government |
Mar.2005 - May.2005 |
| 62 |
Bang Chan
Industrial Estate |
Global Utilities Service
Co., Ltd. |
Plugging for water well abandoned
12", 205m. |
Mar.2005 |
| 61 |
Khon Khen Province |
Khon Khen Brewery
Co., Ltd. |
Groundwater investigation, well design and construction, pumping test and well analysis.
3 Wells were drilled at depth
- 150m.,6",70m.3/hr.
- 150m.,6",70m.3/hr.
- 150m.,6",60m.3/hr. |
Feb.2005 |
| 60 |
Songkhla Lagoon Catchment |
DGR |
Groundwater potential assesment by 3D simulation |
Aug.2003 - Nov.2004 |
| 59 |
Bang Poo Industrial Estate, Samutprakhan Province |
Global Utilities Services Co., Ltd. |
Water well rehabilitation |
Apr.2004 |
| 58 |
Klong 13, Lam Lookha, Phatum Thani Province |
Thai Pure-Drinks
(Coca Cola) |
Water well development 9 well |
Sep.2003 - Dec.2003 |
| 57 |
Samoutsakhon Industrial Estate, Samutsakhon Province |
Global Utilities Service
Co., Ltd. |
Water well investigation by TV.Bore hole camera and Water well rehabilitation |
Jun.2003- Jul.2003 |
| 56 |
Bang Chan Industrial Estate
Bangkok |
Global Utilities Service
Co., Ltd. |
Water well rehabilitation 4 well |
Jun.2002 - Jul.2002 |
| 55 |
Mae Sot Tak Province |
DMR |
Mineral resources exploration and evaluation project: scope of work including geochemical survey and laboratory analysis,geophysical survey and interpretation. |
Aug.2001 - Nov.2002 |
| 54 |
Khong Khung Kamphaeng Phet Province |
Thai Pure-Drinks
(Coca-Cola) |
Groundwater resources assesment project |
Jan.2001 - Mar 2001 |
| 53 |
Nakhon Ratchasima
Province |
Thai Pure-Drinks
(Coca-Cola) |
Groundwater resources evaluation project. mapping and GIS |
Dec.2000 - Jan.2001 |
| 52 |
Kamphaeng Phet Province |
Beer Thai (1991) |
Well design and water well drilling inspector |
Jun.2000 - Mar.2001 |
| 51 |
Sing Buri Province |
Chulalongkorn University |
Test hole and monitoring well |
Jul.2000 - Aug.2000 |
| 50 |
The Lower Chao Phraya Basin |
Chulalongkorn University |
Pumping test project |
Jul.2000- Aug.2000 |
| 49 |
Pa Sang, Lamphun |
DMR |
GW. Modeling Project |
Jun.2000 - Feb.2001 |
| 48 |
Pa Sang, Lamphun |
DMR |
Artificial Recharge Project |
May.2000 - Oct.2000 |
| 47 |
Klong 13, Lam Lookha, Pathun Thani Province |
Thai Pure-Drinks
(Coca-Cola) |
Ping test aquifer analysis GW Management for coke plant |
Mar.2000 - Apr.2000 |
| 46 |
Pathum Thani |
Thai Pure-Drinks
(Coca-Cola) |
Plugging for water well abandoned |
Dec.1999 |
| 45 |
Sadao, Songkla Province |
Safeskin Medical & Scientific (Thailand) Ltd. |
Groundwater and Geotechnical Investigation |
Oct.1999 - Nov.1999 |
| 44 |
Bangkok |
Chula Uniresearch |
Pumping test observation well on Phra Padaeng and Nakorn Luang aquifer |
Sep.1999 - Nov.1999 |
| 43 |
Ngao, Lampang |
Mineral Fuel Division, DMR |
Evaluation of lignite Deposits.Coal seam coring 6000 m. reported published |
Oct.1997 - 1998 |
| 42 |
Udon Thani |
DLD |
Piezometer |
Sep.1997 - Nov.1997 |
| 41 |
Nakhonpanom |
DLD |
Piezometer |
Sep.1997 - Nov.1997 |
| 40 |
Saraburi |
Asia Cement Co., Ltd. |
Groundwater investigation, well design and construction, pumping test and well analysis.
2 well were drilled at
- 60 m.,dia. 6", 12m.3/hr
- 70 m.,dia. 6", 10m.3/hr |
Oct.1997 |
| 39 |
Central Region |
DMR |
Groundwater evaluation for 33 locations |
Oct.1997 - Dec.1997 |
| 38 |
Klong 13,Phatum Thani |
Thai Pure-Drinks
(Coca-Cola) |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 250 m.,dia8", 5 m. 3/hr |
Oct.1997 |
| 37 |
Samut Prakan |
Thai Nam Siri |
Groundwater resource evaluation |
Oct.1997 |
| 36 |
Pudthamonthon 4,5 |
Preuksa Real Estate
Co., Ltd. |
Groundwater resource evaluation |
Oct.1997 |
| 35 |
Bangkok |
PWD |
Seminar on Hydrogeology and Drilling Technical |
Jun.1997 |
| 34 |
Samut Sakorn |
Sarin Property |
Groundwater investigation, well design and construction, pumping test and well analysis.
3 Wells were drilled at depth
- 450m., 10"x8", 160m. 3/hr
- 457m., 10"x8", 95m. 3/hr
- 580m., 10"x8", 155m. 3/hr |
Nov.1996 - Nov.1997 |
| 33 |
Pathum Thani |
Navanakorn Co., Ltd |
Groundwater resource evaluation |
Nov.1996 |
| 32 |
Udtraradit |
DMR |
Hydrogeological mapping,
scale 1 :100,000 |
Oct.1996 - Jan.1997 |
| 31 |
Panorama Resort, Korat |
DMR |
Seminar on Groundwater Management and Development |
Aug.1996 |
| 30 |
Huamark |
Thai Pure-Drinks
(Coca-Cola) |
Plugging for water well abandoned |
Jul.1996 |
| 29 |
Klong 13, Rangsit |
Thai Pure-Drinks
(Coca-Cola) |
Well rehabilitation |
Jun.1996 |
| 28 |
Chiengmai, Lampang, Payao, Udtraradit, Petchaboon |
DMR |
250 Water wells drilling and development at the average depth of 180 ft., dia.6" |
Jun.1996- Sep.1996 |
| 27 |
North-east Region 17 |
DMR |
Groundwater Resource evaluation |
May.1996- Sep.1996 |
| 26 |
Bangbuo,Chacherngsao |
PNC.Concrete |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 80 m. dia.8" , 15 m.3/hr |
Apr.1996 |
| 25 |
Pathum Thani |
Thai Pure-Drinks
(Coca-Cola) |
Water well development by aiflift and surging including of turbine pump installation.
Well depth 350m.,dia.12"x8", 3 hold |
Mar.1996 |
| 24 |
Chiengmai |
RID |
Seminar on Hydrogeology anf Drilling Technical |
Mar.1996 |
| 23 |
North-east Region |
DMR |
Resistivity survey for possible water well drilling location |
Feb.1996 |
| 22 |
Samut Sakom |
Sarin Property |
Groundwater investigation and development. evaluation of groundwater potential |
Nov.1995 |
| 21 |
Suan Pung, Raj Buri |
Siritavee Ranch |
Resistivity survey for 1000 acres |
Aug.1995 |
| 20 |
Cement Plant Puk Rang Saraburi |
Asia Cement Co.,Ltd. |
Resistivity survey, groundwater investigation, well design and construction, pumping test and well analysis
2 wells were drilled at depth
70 m.,dia.8",well yield 60 m.3/hr |
Sep.1995 |
| 19 |
Bang Lane Provincial Office |
DMR |
Installation of 3 monitoring wells at depth 100m. 150m. and 200m.,dia.4" |
Aug.1995 |
| 18 |
Wat Raikohtonsumrong, Nakorn Pathom |
DMR |
Installation of 3 monitoring wells at depth 100m. 150m. and 200m.,dia.4" |
July.1995 |
| 17 |
Wat Lamut, Nakornchaisi |
DMR |
Installation of 3 monitoring wells at depth 100m. 150m. and 200m.,dia.4" |
Jun.1995 |
| 16 |
Kratumban, Sumutsakorn |
Molar Wood Products Co.,Ltd. |
Well-redevelopment for water quality improvement from 500ppm. to 100ppm. Well depth 220m.,dia.4" |
Jun.1995 |
| 15 |
Saiyok, Karnjanaburi |
Saiyok Hill Resort |
Resistivity survey for groundwater investigation |
Jul.1995 |
| 14 |
Nimit Mai,Miniburi |
Saha Group Paper Mill |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 165m.,dia.8",62m.3/hr |
May.1995 |
| 13 |
UdtraRadit |
PWA-director
Nakornsawan |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 24m.,dia.6",20m.3/hr |
May.1995 |
| 12 |
Training Center at Bangpoon |
RID |
Seminar on Hydrogeology and Drilling Technical |
May.1995 |
| 11 |
U-Thai Thani |
Suvinai |
Groundwater investigation, well design and construction pumping test and well analysis.
10 Wells of depth 40-44m.,dia.6" |
Aug. 15-31 1994 |
| 10 |
Khun Noi House |
Khun Noi |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 204m.,dia.6",30m.3/hr |
Aug. 15-31 1994 |
| 9 |
Nakorn-Chaisi |
Evergreen |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 197m.,dia.8",70m.3/hr |
Jul. 20 1994 - Aug 10 1994 |
| 8 |
Rang Sit Plaza |
Rang Sit Plaza |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 197m.,dia.6",50m.3/hr |
Jul. 1-15 1994 |
| 7 |
Lerubol Village Soi Tanommit Ram Indra Rd. Bangkok |
DMR-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 250m.,dia.8",70m.3/hr |
Jun. 4-16 1994 |
| 6 |
Phrapin 2 Village Puddhamonthon Nakornchai-Sai, Bangkok |
DMR-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 243m.,dia.8",70m.3/hr |
Jun. 15 1994 - July 10 1994 |
| 5 |
Chuanchern Village
Outer-ring Rd. Bangkok |
DMR-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 220m.,dia.6",50m.3/hr |
Jul. 3-18 1994 |
| 4 |
Jedsada Village Phahonyothin Rd.
Bangkhen Bangkok |
DRM-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 193m.,dia.6",50m.3/hr |
Jun. 2-15 1994 |
| 3 |
Busarin Village Bangkruay Sainoi Nonthaburi |
DMR-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 273m.,dia.6",50m.3/hr |
Jun. 7 1994 - Jul. 5 1994 |
| 2 |
Greenvill Village Puddamonthon 2 Talingchan |
DMR-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 203m.,dia.6",50m.3/hr |
May. 1-19 1994 |
| 1 |
Suan Thong 2 Village Ramindre Lat plakao Rd.Bangken Bangkok |
DMR-MWA |
Groundwater investigation, well design and construction, pumping test and well analysis.
Well depth 251m.,dia.6",50m.3/hr |
May. 5-18 1994 |